The US 6/Wadsworth Project
The Colorado Department of Transportation (CDOT) is conducting a study of possible improvements to the US 6 ( 6th Avenue) and Wadsworth Boulevard interchange and to Wadsworth Boulevard from approximately 4th Ave to 14th Avenue.
The goal of the project is to improve traffic flow and safety, accommodate high traffic volumes, and increase multi-modal travel options and connections at the interchange and between 4th and 14th Avenues.
Environmental Assessment
This study began in the spring 2007, and is expected to be completed in summer 2009. It is required prior to receiving federal funds. The study describes the effects the project would have on the built and natural environments in the construction area. If a construction project is identified at the end of the study and funding is available, the project would then proceed into final design and construction. Final design typically takes 6 to 12 months to complete, and construction typically takes one to two years.
See CDot's US6/Wadsworth Boulevard website for complete infomation.